Right Center Boom/Lift Gate Lubrication Point Detail (Continued)
Route two lines together for the Lower Parallel
Link and Parallel Link Cylinder Cap
Install #226-13753-8 into Lower Parallel Link port
and connect line from outlet 11. Continue routing
line up to Cylinder Cap.
Install #226-13753-8 into Parallel Link Cylinder
Cap port and connect line from outlet 9.
Install #226-13756-4 into Parallel Link Cylinder
Rod port and connect line from outlet 7.
Install #226-13753-8 into Parallel Link Cylinder
Rod port and connect line from outlet 13. Follow
large hose up to lube port.